How The Better Billy Bunker Method Works


Start with a poor draining contaminated bunker
Old material is removed and bunker core is prepared for local rock installation
Local rock is installed per specification
The local rock is ready for the patented application installation
The patented method of application takes place. Only done by certified installers. Contact for Listings/Questions
Product is applied to specification insuring customer satisfaction
Bunker in foreground with white sand used the Better Billy Bunker Method. The two bunkers in the background used traditional methods, and over time sand contamination resulted causing clogged drain lines and washouts
Beautiful bunker after 2 inch rain. The Better Billy Bunker! 10 Year limited warranty. Durable-Linerless-Guaranteed!
Patent Pending 2009 Installed ONLY by Certified Installers

The History of the Better Billy Bunker


The Evolution and History of The Better Billy Bunker

The industry tagged the name Billy Bunker for former Augusta National Golf Club’s superintendent Billy Fuller, who invented this bunker construction specification in 1981. The design was to improved a bunker’s drainage and playability by using drainage pipe, a layer of pea gravel, a cloth liner and quality bunker sand.
And it worked! Billy Bunker became the standard specification used by hundreds of golf courses.
The specification has been improved, eliminating the need for a geo-textile liner and now the Better Billy Bunker Method has been developed to eliminate geo-textile. It uses a patented construction method that is the most durable and fastest draining bunker construction method on the market. Below the ST410 polymer is applied using the patented technique.